navvis-logo-new
Case study | December 2019

Vermessung Schubert brings BIM to an Austrian landmark

When NavVis mapping partner and surveying company Vermessung Schubert were chosen to work on the renovation of Gumpendorfer Strasse Station, one of 109 stations in the Vienna metro system, they were faced with a unique problem: the original plans were paper drawings from 1898.

download case study

What’s inside:

  • Challenge - Capturing over 2,000 square meters of a historical and bustling metro station without disruption to services with a high-level of detail.
  • Solution - The NavVis M6 Indoor Mobile Mapping System scanned the whole station in only six hours, complete with ground control points and georeferencing.
  • Result - Vermessung Schubert now offers fast data capture for creating BIM models, plus the added value of browser-based access to inspect a building using NavVis IndoorViewer
navvis-logo-new
  • 现实捕捉
  • 数字工厂
  • 资讯信息
  • 合作伙伴
  • 公司
  • 职位信息
  • 联系我们
linkedin linkedin
twitter twitter
youtube youtube
social-media-wechat-icon social-media-wechat-icon

© 2022 NavVis

版本说明

隐私政策